enLanguage

Zwy-80 Mucking Equipment Underground Mucking Loader Load-Haul-Dump Loader

The Mucking Loader for Tunnel Project is available to provide an efficient, reliable, cost-effective and lower-risk method of removing muck and spoil from tunneling excavation sites.
Designed with the powerful motor, the machine is capable of working fast with high output which can greatly enhance its working efficiency, making it the cost effective one.

Product Description

-The Mucking Loader for Tunnel Project is available to provide an efficient, reliable, cost-effective and lower-risk method of removing muck and spoil from tunneling excavation sites.

-Adopting  quick coupler, the operating mechanism is suitable for tunneling rock strata with different hardness.

-Mucking Loader for Tunnel Project can complete whole section excavating and mucking operation without dead angle. Besides, mucking task can be finished thoroughly without human assistance.

-Designed with the powerful motor, the machine is capable of working fast with high output which can greatly enhance its working efficiency, making it the cost effective one.

-Compact and sturdy construction, the equipment is strong enough to bear whole weight that it can work steadily and consistently with excellent performance.

-With strict process standards, the Mucking Loader for Tunnel Project has superior quality which is suitable for tunnel project. And it is popular among the market due to its wear resistance, easy operation as well as improved working efficiency.

Product Parameter

Excavating Dimension(mm) 

4800*1700*2800

Excavating Depth(mm)

500

Unloading Height(mm)

1646

Minimum Loading Height(mm)

1470

Unloading Distance(mm)

1600

Maximum Rotation Angle(°)

±50

Weight(T)

8.8

Dimension(mm)

6100x1800x1800

Loading Capacity(m³/hour)

80

Min Turning Radius(mm)

5500

Travelling Speed(m/min)

2-3.8

Applied Tunnel Gradient(°)

≤30

Motor Power(kw)

30

Maximum Material By Size(LxWxH)   (mm)

650x680x650

Ground Clearance(mm)

280

Applied Working Section(W*H)   (m)

≥2.2x2.2

Nominal Working Pressure(Mpa)

20

Hot Tags: mucking loader for tunnel project, China, factory, suppliers, manufacturers, cheap, price, loader emissions, hydropower site hardcore handling loader, loader retrofit, hydropower tunneling loam handling loader, hydropower project peat removal equipment, loader serial number plate

 

Previous: SDF Automatic Glass Cutting Machine with Loading Arms for Building Appliace Solar Glass and Rock Beam
Next: Mining Mucking Machine Pneumatic Rock Shovel Loader Price

 

Open Mobile Site

You Might Also Like