Monitoring and inspection • The inspection of equipment for the tunneling works shall be carried out by the experts (e.g., equipment engineer or equipment foreman) in accordance with the existing specifications of the country where the user is located (e.g., German Accident Prevention...

Mucking Loader With Breaking Hammer

Monitoring and inspection

The inspection of equipment for the tunneling works shall be carried out by the experts (e.g., equipment engineer or equipment foreman) in accordance with the existing specifications of the country where the user is located (e.g., German Accident Prevention Regulation):

Before the equipment is put into operation for the first time and after the major changes are completed;

At least once a year;

At the same time, according to the operating conditions and local environment.

Keep the inspection report and archive the documents until the next inspection.

Check the equipment for tunneling work according to the inspection plan before the start of each shift.

The hydraulic hoses shall be replaced immediately after the following damages are found:

The outer layer is damaged and the middle layer is affected;

The outer layer has partial wear;

The deformation under compression and non-compression is different from that of the newly installed hose;

It is leaky;

The hose joint is damaged or the connection between the connector and the hose is damaged.

The coolant level can be inspected only after the motor  is closed. The tank cover shall be rotated to release the excessive pressure.

Check the functions of the security device before using equipment.

In case of any failure, the relevant person in charge shall be notified immediately, and the next operator shall be informed during the shift change.

Hydraulic system diagram:


 

Hot Tags: mucking loader with breaking hammer, China, factory, suppliers, manufacturers, cheap, price, loader origin, hydropower project soil mucking loader, hydropower project loam removal equipment, hydropower project clay handling equipment, hydropower project sediment removal loader, coal unloading specification terms

 

Previous: Xdn500 Automatic 3000mm Compound Slurry Rock Pipe Jacking Machine/Tunnel Boring Machine
Next: Everun Mini Battery Electric Wheel Loader 0.4 Ton Front End Loader Erel04 Small Battery/Electric Four Wheels Loader with Multi-Attachments

 

Open Mobile Site

You Might Also Like