enLanguage

Mucking Rock Loader for Tunnel Mining Hydraulic Mucking Machine

Stability on slope . There is danger of overturning on the inclined ground. . The operations on the soft ground (excavation and lifting) may encounter special hazards. . Be especially careful on the ground with a slope greater than 18° . . When going through the road with obstacles, the angle of...

Mucking Rock Loader

Stability on slope

.There is danger of overturning on the inclined ground.

.The operations on the soft ground (excavation and lifting) may encounter special hazards.

.Be especially careful on the ground with a slope greater than 18° .

.When going through the road with obstacles, the angle of inclination will be increased.


Maximum inclination:

.Test the stability of mucking loader before operations.


The technical parameters of stability are measured on the horizontal, strong and uniform ground. Stability calculations require the placement of mucking loader on a uniformly solid ground. If the working environment of the loader during operations cannot meet the requirements (such as soft uneven ground, out-of-level, side overload, etc.), the operator must take measures:

.The mucking loader shall be properly fixed to prevent rolling or sliding.

.Adjust the traveling mechanism to ensure the track movement.

.Slow down the working speed.


Spare parts photos:


Hot Tags: mucking rock loader, China, factory, suppliers, manufacturers, cheap, price, loader performance standard, loader uniform, loader performance, hydropower site loam handling mucking machine, hydropower construction hardcore handling equipment, loader safety glasses

 

Previous: Zwy-100/45.75L Coal Rock Crawler Mucking Loader Machine
Next: Zwy-160/48g Rail Wheel Mucking Loader

 

Open Mobile Site

You Might Also Like