enLanguage

Environmental Friendly Small Tunnel Crawler Backhoe Skid Steer Loader

When the mucking loader is delivered to the operator, the following matters shall be completed: Operator's guidance: Through the practical training on the mucking loader, the "operation guidance" shall be explained in detail (page by page) to the operator. Matters of particular...

Tunnel Loader

When the mucking loader is delivered to the operator, the following matters shall be completed:

Operator's guidance:

Through the practical training on the mucking loader, the "operation guidance" shall be explained in detail (page by page) to the operator.

Matters of particular importance include:

The accident prevention regulations issued by the principal liability insurance association of local country.

Technical data.

Operator control, instructions and warnings.

Inspection before use of mucking loader.

 

Explanation of hydrostatic crawler drive.

Driving.

Recovery and transportation of mucking loader.

Operations of all functions.

Tension and adjustment of track chain.

Explain maintenance intervals and points to the operator according to the "maintenance and inspection plan".

According to the "lubrication form", these lubrication points are demonstrated on the mucking loader and the lubrication intervals and points are explained to the operator.

 

 

General drawing:

Tunnel Loader 

 


Hot Tags: tunnel loader, China, factory, suppliers, manufacturers, cheap, price, hydropower construction earthmoving equipment, loader importer, Wheel Loader, hydropower project mucking equipment, hydropower project waste removal equipment, tracked mucking loader

 

Previous: 2019 New 75HP Crawler Skid Loader Wheel Loader Track Skid Steer Loader Mini Loader with America Kohler EPA Tire 4 Engine
Next: Everun New Generation Agricultural Machinery Construction Small Front End Wheel Loader with Euro5 and Tier4 Engine

 

Open Mobile Site

You Might Also Like